Total Visitors

Sunday, 2 June 2013

Aircondition ducting + Split level steps + Brickworks final.

Ducted Air-conditioning connections installed plus split level brick steps on the ground floor done which will be tiled later on! Both were also done last Friday when all the brick works was finished.

















No comments:

Post a Comment