The lower roof's gutter and fascia were installed last Friday and finished today plus new scaffolding for the lower roof areas.
They say that life begins at 40, My wife and I decided to build our dream home and I think that the long process and the stress involved in building your dream home is worth it. Our villa of 10 years which we are going to invest when our home is finish is small for us now because we have 3 young kids. We chose the Columbus 26 ,a 2 storey home with a split level in the Macarthur region of Sydney.Live life to the full! Here is our exciting journey ahead!
Total Visitors
Monday, 17 June 2013
Tuesday, 11 June 2013
Scaffolding removal.
Scaffolding were removed today but they left some on the lower roof area to finish the roof tiling later on.
Saturday, 8 June 2013
Di Lorenzo Tiles - Back again.
We went to Di Lorenzo at Bella Vista to select new floor tiles for the main bathroom and powder room because the one that we have chosen six months ago were discontinued so we also took photos of all our selections including the carpet while we were there today.
![]() |
| Our Ensuite wall,floor and feature tiles. |
![]() |
| Main Bathroom wall and feature tiles only, we selected a different floor tile. The wall tile is also the same for the laundry. |
![]() |
| The big rectangular wall tile is for the kitchen splashback. |
![]() |
| The big rectangular tile is for the ground floor powder room wall tiles. |
![]() |
| The tile on the top is for the ground floor powder room floor tiles. |
![]() |
| Floor tiles for the laundry, main bathroom and WC main bathroom. |
![]() |
| The one on the left is the tiles for the ground floor area - entry,foyer,kitchen,dining,leisure & walk in pantry excluding the powder room and lower lounge area. The one on the right is the tile for the front patio area. |
| Carpet on all the 4 bedrooms,walk in robe, hallway, upper lounge and lower lounge area. |
Friday, 7 June 2013
Wednesday, 5 June 2013
Downpipes + New site supervisor.
I've met my new site supervisor Craig today because Andrew M. left the company,Also building materials for the eaves were delivered and downpipes installed but to be continued.
Tuesday, 4 June 2013
Sunday, 2 June 2013
Aircondition ducting + Split level steps + Brickworks final.
Ducted Air-conditioning connections installed plus split level brick steps on the ground floor done which will be tiled later on! Both were also done last Friday when all the brick works was finished.